TRPA is seeking stakeholder input for the proposed revised Final Draft BMP Handbook between June 1 to August 1, 2011.  Input will be addressed and pertinent changes made to the Final Draft BMP Handbook.   A Final BMP Handbook is expected to be presented to the TRPA Governing Board in late fall or winter of 2011. Click here to submit your input.

 

Final Draft BMP Handbook

Chapter 4 BMP Toolkit BMP Drawings
4.1 Hydrologic Source Control  
Pervious Pavement Pervious Concrete
Infiltration Basin Infiltration Basin
Infiltration Trench Infiltration Trench
Subsurface Infiltration System Armored Dripline
Rain Barrel and Cistern Planter Bed Dripline
Rain Garden Infiltration Facility
Filter Strip Vegetated Filter Strip
  Level Spreader
4.2 Pollutant Source Controls  
Roadway and Parking Lot Pollution Prevention  
Abrasive and Deicer Management Slope Protection
Street Sweeping Willow Wattle
Snow Storage Terrace Walls
Soil Stabilization Timber Retaining Wall
Vegetated Slope Stabilization Stacked Rock Wall
Terracing Riprap Slope Protection
Retaining Wall Slope Bottom Bench
Riprap Serrations
Slope Shaping Contour Furrow
Soil Stabilization (Non-Vegetative) Grading for Sheet Flow
Paving Parking Areas and Roads Rock Armor Elevated Structure
Bare Soil Protection Parking Barriers
Deck Armor  
Parking and Vehicle Barriers  
Waste Management and Materials Pollution Prevention  
Dumpster Management  
Hazardous Material Management  
Nursery Facility Management  
Pet Waste Management  
Livestock Facility Management  
Pool and Hot Tub Management  
Vehicle Washing  
4.3 Stormwater Collection and Conveyance  
Culvert Rolled Curb
Curb and Gutter Curb Break
Storm Drain Outlet Protection
Outlet Protection Flow Splitter
Drain Inlet Slotted Channel Drain
Flow Splitter Pavement Swale
Slotted Channel Drain Subsurface Drain
A/C Swale Rock-Lined Swale
Subsurface Drain Vegetated Swale
Rock Lined and Vegetated Swale Check Dam
Check Dams
 
4.4 Stormwater Treatment  
Biofiltration and Detention Wet Basin
Wet Basin Bioswale
Bioswale Dry Basin
Dry Basin Sediment Trap
Flow Through Treatment Sediment Trap 2
Drop Inlet Insert  
Trash Rack  
Baffled Vault  
Hydrodynamic Separator  
Media Filter  
Sediment Trap  
4.5 Temporary BMPs for Construction  
Site Preparation and Practices Temporary Boundary Construction Fencing
Construction Planning and Scheduling Dewatering
Construction Boundary Fencing Chute or Flume
Dewatering Flexible Downdrain
Clean Water Diversion Pipe Slope Drain
Vegetation Protection Water Diversion
Temporary Sanitation Facility Vegetation Protection
Dust Control Vehicle Tracking Control
Vehicle Ingress Egress Management Concrete Washout Station
Winterization Stockpile Management
Construction Staging Drain Inlet Protection
Material Handling Storage and Safety Fiber Rolls
Topsoil Salvage Silt Fence
Concrete/Bentonite Management Silt Fence Placement
Stockpile Management Erosion Control Blanket
Erosion and Sediment Control Anchoring Geo-Textiles in Channels
Sweeping  
Drain Inlet Protection  
Fiber Roll  
Silt Fence  
Erosion Control Blanket System  
Hydromulch, Tackifier, and Soil Binder